Summary of project
Location Science Area
Department(s) Chemistry
About the building

The two main labs are spread over two floors, each with space for up to 100 students.  There is also a large seminar room equipped with the latest audio-visual equipment, write-up areas and a bright and welcoming reception area.

Each floor has its own dedicated prep room and across the corridor from the second and third year lab is a large furnace room and analytical suite which houses over £2m worth of equipment for undergraduate use. Chemistry’s undergraduates are some of the first in the UK to use the new generation of bench-top NMR spectrometers.

Completion July 2018
Architect FJMT
Main contractor ISG