Tinbergen Chemistry Extension

Photo of Tinbergen Chemistry Extension

© CPC

 

Location Science Area
Department(s) Chemistry
About the building

The two main labs are spread over two floors, each with space for up to 100 students.  There is also a large seminar room equipped with the latest audio-visual equipment, write-up areas and a bright and welcoming reception area.

Each floor has its own dedicated prep room and across the corridor from the second and third year lab is a large furnace room and analytical suite which houses over £2m worth of equipment for undergraduate use. Chemistry’s undergraduates are some of the first in the UK to use the new generation of bench-top NMR spectrometers.

Completion July 2018
Architect FJMT
Main contractor ISG

 

 
1 Start 2 Complete